ASML Veldhoven
A growing campus
At Run 1000 in Veldhoven, right next to the A2 motorway, the new ASML campus, constructed in 2024, consists of four office buildings, a central plaza and two annexes.
Completion: Q4 2023 Client: Hurks
ASML Veldhoven
A growing campus
At Run 1000 in Veldhoven, right next to the A2 motorway, the new ASML campus, constructed in 2024, consists of four office buildings, a central plaza and two annexes.
Completion:
Q4 2023
Client:
Hurks

Last update: 28-02-2024

1. The project: ASML, Veldhoven

At Run 1000 in Veldhoven, right next to the A2 motorway, the new ASML campus, constructed in 2024, consists of four office buildings, a central plaza and two annexes. The new office buildings are an example of modern, sustainable design. They cover a floor area of around 48,000 m2 and will accomodate around 4,000 employees.

Sustainable construction

ASML: "The buildings fit ASML's vision of the future. The building design is progressive, with sustainability playing a central role. It is a new building that offers a pleasant and healthy working environment; for now and in the future. The building design, with a floor area of no less than 47,880 m2, has a BREEAM Excellent and WELL GOLD sustainability level. This is not just about saving energy, but also about creating optimal conditions when it comes to health and well-being in the building." (28-02-2024 ASML/Campus

2. Byldis contribution to this project

Byldis developed a highly efficient solution that was manufactured off-site to very high tolerances and an exquisite level of finish. This design allows for a very high performing office with large open spaces and tall floor to ceiling heights that was constructed in a matter of weeks but will last for over a hundred years. This is achieved with our complete off-site solution for a precast concrete structure and façade including windows.

3. Facts & Figures

 The project

 The new campus consists of four office buildings, a central plaza and two annexes.
 Renovation of an existing car park.

 Location  Veldhoven
 Scope of project  47,880 m2
 Byldis expertise involved  Byldis total concept (engineering, precast concrete, aluminium facades)
 Expected completion Byldis  Q4 2023
 Client  Hurks​
 Architect  EGM

4. Footage

Project video from Byldis:

To view this video you must accept marketing-cookies.
"The building design is progressive with sustainability playing a central role. This is a new building that provides a pleasant and healthy working environment; for now and in the future."
28-02-2024, www.asml.com
"The building design has a BREEAM Excellent and WELL GOLD sustainability level. This is not just about saving energy, but also about creating optimal conditions when it comes to health and well-being in the building."
28-02-2024, www.asml.com

Photos above: Fotostudio Eye 4 You

Photos above: update work Byldis June 26, 2023

We are Byldis

four
office buildings

Campus, Veldhoven

Sustainable construction

Modern, sustainable design