De Spakler Amsterdam, The Netherlands
Focus on sustainability
The Spakler is the first energy-neutral residential tower in the Netherlands with a total of 160 apartments. A big step in environmentally friendly living in the Netherlands.
Completion: 2017 Client: A combination of Hurks, Lingotto & AFP International
De Spakler Amsterdam, The Netherlands
Focus on sustainability
The Spakler is the first energy-neutral residential tower in the Netherlands with a total of 160 apartments. A big step in environmentally friendly living in the Netherlands.
Completion:
2017
Client:
A combination of Hurks, Lingotto & AFP International

1. The project: De Spakler

There is a first time for everything. We built the first energy-neutral residential tower in the Netherlands in a prominent location on the Amstel, in the former industrial area of Overamstel. The sustainable character and energy-neutral calibre of the residential tower are hot topics among the residents of Amsterdam. Together with partners Lingotto and AFP International, we realised an energy performance coefficient of 0. As well as apartments from 50 to 75 m2 with their own storage areas in the basement, De Spakler also houses 52 parking spaces, a bicycle parking facility for approx. 250 bikes and 500 m2 of commercial spaces.

2. Byldis contribution to this project

Byldis produced and supplied the sandwich elements (partly blasted with green concrete and partly finished with brickwork) for De Spakler. We also supplied the full floors, internal walls, pointed balconies and steel columns.

3. Why was Byldis chosen?

The Byldis total concept was used to construct De Spakler. The Byldis total concept (Engineering, Prefab and Facades) consists of an integrated facade system. The facade of De Spakler consists of ready-made sandwich panels made of precast concrete. These in turn consist of concrete inner and outer cavity sheets (partly precast concrete, partly precast brickwork) with a sturdy insulation package in between. The facade elements are also fitted with insulating, triple glazing and assembly rails for PV panels.

The supporting facades, walls, stability cores and floors are all precast. The precast panels were made in the factory, which significantly reduced the construction time in relation to traditional construction methods. This resulted in an enormous construction speed and thus also time savings. 

This is the proof: energy-neutral living at a high standard is possible!

4. Challenges & solutions

We had to keep to our promise of constructing one storey of De Spakler per week.
“We built one storey per week. They were delivered wind and watertight. Due to the limited amount of space on the construction site – there was literally space for one lorry – we had to supply everything just-in-time.” says Henk Louwerens – project manager at Byldis.

2500 m2 panels
An EPC of zero has been achieved by largely covering a number of facades and roofs with solar panels. In total there are 2,500 m2 of PV panels. This means an impressive 10 to 16 panels per residence. Although the precast concrete sandwich elements for the residential tower were delivered to the construction site complete with glazing, the solar panels were fitted to the facade later. The assembly rails, however, were mounted in the factory, so that the panels could be mounted using a hoisting scaffold.

5. Facts & figures

 The project

 Energy-neutral residential tower and 500 m² commercial spaces

 Location

 Amsterdam, The Netherlands

 Project size

 28 storeys, 73 meters high

 Byldis contribution

 

 

 

  • Sandwich elements, partly blasted with green concrete and partly finished with brickwork and frames
  • Full floors
  • Internal walls (partially) others by Holcon
  • Pointed balconies
  • Stairs and landings
  • Steel columns

 Byldis expertise involved

 Byldis total concept (engineering, precast concretealuminium facades)

 Start of production Byldis

 September 2015

 Start of assembly Byldis

 April 2016

 Completion Byldis

 May 2017

 Client

 Hurks Bouw & vastgoedontwikkeling

 Architect

 Mecanoo

7. More information about De Spakler

In the news

More information

We are Byldis

160
apartments

2.500
square meters
of solar panels

The first energy-neutral residential tower in the Netherlands