One Thames City London
Iconic presence
The building is characterised by its mass with large facade piers which we suspend from the building. The detailed engineering and assembly are extremely challenging. These two factors are therefore the reason why the client chose Byldis Engineering and Byldis Prefab.
Completion: february 2022 Client: Mace
One Thames City London
Iconic presence
The building is characterised by its mass with large facade piers which we suspend from the building. The detailed engineering and assembly are extremely challenging. These two factors are therefore the reason why the client chose Byldis Engineering and Byldis Prefab.
Completion:
february 2022
Client:
Mace

1. The project: One Thames City

Flowering new city
Step inside this fresh district of London with three residential towers at its helm that’s set to become the new favourite landmark on the London skyline. A significant development of 12 buildings, Thames City offers beautiful apartments and private luxury amenities, high-end retail and exquisite dining experiences. All life interconnects through a network of lush parks, intimate green courtyards and enchanting city squares.

2. Byldis contribution to this project

Byldis will produce, supply and assemble the prefabricated cladding elements for this residential tower. The building is typified by the mass of hefty facade pendants that we are suspending from the building.

Fun facts:

  • these elements contain a total of 2,120 cubic metres of concrete and 240,000 kg of reinforcing steel
  • around 10 moulds required for production
  • this project involves more than 6,200 production hours in the plant
  • approximately 270 shipments needed to transport all elements to London

3. Facts & figures

 The project

 

 Residential tower

 Location

 London, UK

 Scope of project

 18 floors

 Byldis contribution

 

 

  • 321 facade columns
  • 241 facade beams
  • 63 balcony elements
  • 14 single-shell façade elements

 Byldis expertise involved

 Byldis Engineering, Byldis Prefab

 Start production Byldis

 June 2021

 Start assembly Byldis

 October 2021 and goes very fast with 2 cranes assembling simultaneously 

 Expected completion Byldis

 Assembly of the elements will be completed in February 2022.
 Finishing such as insulation (2,500m²) and sealant work (2,500m¹) will continue until June 2022.

 Client

 Mace

 Architect

 SOM