The building is characterised by its mass with large facade piers which we suspend from the building. The detailed engineering and assembly are extremely challenging. These two factors are therefore the reason why the client chose Byldis Engineering and Byldis Prefab.
The building is characterised by its mass with large facade piers which we suspend from the building. The detailed engineering and assembly are extremely challenging. These two factors are therefore the reason why the client chose Byldis Engineering and Byldis Prefab.
Flowering new city Step inside this fresh district of London with three residential towers at its helm that’s set to become the new favourite landmark on the London skyline. A significant development of 12 buildings, Thames City offers beautiful apartments and private luxury amenities, high-end retail and exquisite dining experiences. All life interconnects through a network of lush parks, intimate green courtyards and enchanting city squares.
2. Byldis contribution to this project
Byldis will produce, supply and assemble the prefabricated cladding elements for this residential tower. The building is typified by the mass of hefty facade pendants that we are suspending from the building.
Fun facts:
these elements contain a total of 2,120 cubic metres of concrete and 240,000 kg of reinforcing steel
around 10 moulds required for production
this project involves more than 6,200 production hours in the plant
approximately 270 shipments needed to transport all elements to London
3. Facts & figures
The project
Residential tower
Location
London, UK
Scope of project
18 floors
Byldis contribution
321 facade columns
241 facade beams
63 balcony elements
14 single-shell façade elements
Byldis expertise involved
Byldis Engineering, Byldis Prefab
Start production Byldis
June 2021
Start assembly Byldis
October 2021 and goes very fast with 2 cranes assembling simultaneously
Expected completion Byldis
Assembly of the elements will be completed in February 2022. Finishing such as insulation (2,500m²) and sealant work (2,500m¹) will continue until June 2022.
Client
Mace
Architect
SOM
6. Footage
Thames City is an iconic presence in Zone One on the River Thames.